Installing Package Bees and Nucleus Colonies

Learn Beekeeping

Arrange installation help before pickup day. Follow the bee supplier’s instructions for the exact package, queen cage or nuc you receive.

Before the bees arrive

Have a stable hive stand, assembled boxes, correctly sized frames, protective clothing, a feeder and a safe water source ready. Confirm local registration and siting requirements. Practice opening and closing the empty hive.

Package or nuc

A package contains adult bees and usually a separately caged queen, without brood frames. A nuc is a small colony on comb. Confirm a nuc’s frame depth and how many frames are included before buying equipment.

Installation day

  1. Confirm your site and arrange safe transport without overheating the bees.
  2. Read the supplier’s procedure fully before opening anything.
  3. For a nuc, move frames in their existing order and orientation into matching equipment; avoid chilling brood or crushing bees.
  4. For a package, follow the supplied placement and queen-release procedure. Do not improvise immediate queen release.
  5. Provide feed when needed under local guidance and check that bees can reach it safely.

Plan the first follow-up

Write down installation time, queen status, feeding and the supplier’s next-check date. At the appropriate inspection, look for evidence of a laying queen. Contact the supplier or mentor if release or establishment is uncertain.

Start with hive equipment and feeders. These equipment listings do not include bees unless explicitly stated.

Keep learning

Use local bloom, weather, colony strength and guidance from your state apiary program to adapt this information. Keep a dated inspection record and ask a local mentor when observations are unclear.

Sources and further reading

Reviewed November 19, 2026.